Project Description:
The NSGH was the largest single hospital ever undertaken in Scotland. The hospital, one of the most advanced medical facilities in the world, will include a 14-floor adult hospital with bed capacity of 1,109 and a 5 storey children’s hospital with a 256 bed capacity. The facility will have 20 operating theatres and be home to major specialised services of renal medicine, transplantation and vascular surgery.
Products:
Advanced Technical Products Ltd (ATP Ireland) supplied over 5000 PICV valve sets to this project, each set consisting of a Flowcon Green PICV with actuator and binder test points, strainer with blowdown valve & binder test point and the 3 way flushing bypass. The assemblies were all assembled & tested at the factory prior to delivery to site or to the fabrication companywho were making up pre-assembled pipework modules.
Various actuators were used depending on the application, thermal on/off actuators for the chilled beams, 2 position electricactuators for the heater batteries and electric 0-10V modulating actuators for the FCU’s.
The Flowcon Green PICV offers 100% authority on any of its 41 flow settings and will deliver precise flow to the terminal unit independent of any pressure fluctuations.